Download
Technology
Idea
Principle
Configuration
Construction guidelines
Animation
Did you know that…
the latest trend is to integrate the bath-room and bedroom?
Either by removing the wall between the rooms, or by installing a glass partition, which allows exciting light effects.
Construction guidelines
Heavy floor construction with concrete and stone/tiles
Unidrain is approved for heavy floor construction with concrete provided that the construction guidelines are followed and that the construction and application comply with applicable legislation, construction regulations and instructions in accordance with:
- Building code 07 (BR07)
- SBi Instruction 200 for wetrooms (Danish Building Research Institute)
For further information about construction regulations and approvals, read more
here
.
(00) Construction principle
(01) Components
(02) Assembly of unit and housing
(03) Positioning and fitting
(04) Fastening of unit
(05) Casting of raw cement
(06) Preparation for levelling course
(07) Execution of levelling course
(08) Forberedelse for vandtætningssystem
(09) Edge reinforcement/sealing
(10) Edge reinforcement/sealing (continued)
(11) Waterproofing (lubrication) membrane
(12) 100% wetroom moisture control
(13) Frame installation
(14) Frame type and positioning
(15) Tile installation
(16) Grouting
(17) Final assembly
(18) Cleaning and maintenance
Quick menu
Contact
Catalogue
Construction guidelines
FAQ
News
Gallery
References
Dealers
Maintenance
Tender descriptions
Home
Print
Search
Sitemap
Country
Tip a friend
E-mail