(08) Preparation for waterproofing system
(Construction instructions concrete)
The drain unit is very carefully cleaned for any concrete remains, dust and dirt. Grease is removed from all floor and wall flanges with a suitable degreasing agent.
The floor and wall flanges are cleaned as needed and possibly priming is carried out in accordance with instructions from the supplier of the wetroom system.
NB:
Be very meticulous that the floor and wall flanges are completely cleaned and degreased.