(08) Preparation for concreting
(Construction instructions concrete with core)
Pipe and outlet unit is carefully supported and the concrete support (concrete batts) are laid on in the core.
NB:
Check that the drain unit is positioned horizontally and at the correct height and that the outlet unit and drain unit are completely assembled.