(05) Installation and pipe connection
(Wooden floor construction with 22 mm plywood)
The pipe connection is carried out and the drain unit is positioned with the wall flanges close up against the walls. To ease the connecting of pipes, the middle trimming can be fitted last.
NB:
Check that the drain unit is stable and completely level, that the distance strip is correctly placed just behind the floor flanges bend and that the wall flanges are close up against the walls.